ESM: Block 2 of REK Bitola has been put into operation
After Block 3 was disconnected from the grid due to a pipe failure in the boiler, Block 2 of REK Bitola was put into operation, ESM announced. ESM adds that Block 1 is also ready, and will be put into operation if needed. - JSC ESM this period meets the electricity needs of consumers...
ESM: Block 2 of REK Bitola has been put into operation Read More »